Hard Bluestone Mining! From 200T to 2000T/D | 150 Hydraulic Splitter High Efficiency Solution
1. Project Pain Points
The customer engaged in bluestone mining faced severe low-efficiency and high-cost issues with traditional construction methods. Relying on a 30-ton excavator equipped with a breaker hammer, the daily mining output was only about 200 tons. The breaker hammer suffered from serious wear and high fuel consumption, resulting in extremely high unit mining costs and slow project progress, failing to meet production targets.
2. Breaking Solution
After analyzing the hard bluestone texture, mining volume and cost pain points, our technical team provided a targeted static rock breaking solution. We configured **6 sets of 150 hydraulic splitters and one diesel power station**, with standardized construction parameters: 150mm hole diameter, 1.5m hole depth, 2m hole spacing and 1.5m row spacing, fully adapted to hard bluestone mining conditions.
3. Significant Practical BenefitsAfter applying the hydraulic splitter system, the on-site construction effect was extremely impressive. The customer’s daily mining output surged to **1800–2000 tons**, with overall mining efficiency increased by over 600%. It greatly reduces fuel consumption and frequent accessory replacement costs, cutting comprehensive construction costs by 40%. The stable static breaking method greatly accelerated project progress and won full recognition from the customer.